Concrete Takeoff Kit • Construction Takeoff & Bidding Spreadsheets
Concrete Contractor Flatwork & Footing Bid Master Sheet
Automated cubic yardage calculator for slabs, thickened-edge monolithic footings, rebar grid spacing, gravel subbase tonnage, and 50-state ready-mix concrete cost benchmarks.
What's Included in This Multi-Tab Workbook
Compatible with Microsoft Excel (.xls/.xlsx), Google Sheets, Apple Numbers, and includes a formatted Printable PDF Compliance Binder View.
- Tab 1: Slab & Footing Takeoff (9 pre-built rows) Included
- Tab 2: Pour Day Quality Log (5 pre-built rows) Included
- Tab 3: 50-State Concrete & Frost Table (50 pre-built rows) Included
- 50-State 2026 Rate & Statutory Lookup Table Included
- Print-Ready Client / Compliance Binder View Included
Instant Digital Download
$19 One-Time (Zero Monthly Fees)
Includes 3 pre-built tabs + 50-state lookup data
Save 15+ hours of spreadsheet engineering. Every row below is pre-populated so you can plug in your numbers or print the compliance checklist immediately.
← Back to Free Interactive 50-State CalculatorInteractive Workbook Tab Preview & Printable Binder Sheets
Tab 1: Slab & Footing Takeoff
| Component / Cost Item | Quantity | Unit | Unit Price ($) | Total Cost ($) | Engineering / Field Spec |
|---|---|---|---|---|---|
| Main Slab Concrete (24'x24' @ 4" + 10% waste) | 7.82 | Cubic Yards | 168 | 1313.76 | 4,000 PSI w/ 6% air entrainment + fiber mesh |
| Perimeter Turndown Footing (96 lin ft @ 12"x12") | 3.91 | Cubic Yards | 168 | 656.88 | Monolithic thickened edge below frost line |
| Compacted Crushed Stone Base (4" depth) | 11.5 | Tons | 34 | 391 | 3/4" minus crushed limestone compacted to 95% |
| Under-Slab Vapor Retarder (15-Mil Class A) | 650 | Sq Ft | 0.28 | 182 | Lapped 6" at seams and taped with moisture tape |
| #4 Rebar Grid (18" OC Both Ways + Chairs) | 820 | Linear Ft | 0.85 | 697 | Grade 60 #4 deformed bar on 2" dobies/chairs |
| Form Lumber, Stakes, Release Oil & Expansion Joint | 96 | Linear Ft | 2.4 | 230.4 | 2x6 perimeter forms + 1/2" asphalt expansion strip |
| Excavation, Forming, Pour & Power Trowel Labor | 32 | Crew Hours | 88 | 2816 | 4-man flatwork crew (prep day + pour/sawcut day) |
| Acrylic Curing & Sealing Compound (2 coats) | 2 | 5-Gal Pails | 115 | 230 | ASTM C309 cure-and-seal applied after finishing |
| TOTAL CONCRETE FLATWORK BID | 576 | Sq Ft | 11.31 | 6517.04 | Complete turnkey slab & footing estimate |
Tab 2: Pour Day Quality Log
| Quality Control Check | Target Specification | Recorded Value | Time Checked | Foreman Initials |
|---|---|---|---|---|
| Subgrade Compaction & Proof Roll | Firm, uniform, zero rutting or standing water | Verified | 07:00 AM | JM |
| Vapor Barrier & Rebar Chair Clearance | Rebar centered in slab; 2" clear cover | Verified | 07:30 AM | JM |
| Ready-Mix Batch Ticket Verification | 4,000 PSI, max 0.45 w/c ratio, 4"–5" slump | 4.5" Slump | 08:15 AM | JM |
| Bull Float & Bleed Water Wait Period | Do not steel trowel while bleed water is present | Verified | 10:30 AM | JM |
| Control Joint Sawcutting (1/4 Slab Depth) | Cut within 4–12 hours @ max 10'x10' panels | Cut @ 1.25" | 03:00 PM | JM |
Tab 3: 50-State Concrete & Frost Table
| State | Abbr | 4,000 PSI Ready-Mix ($/yd³) | Frost Line Depth (Inches) | Avg Labor Rate ($/hr) | Local Engineering Note |
|---|---|---|---|---|---|
| Alabama | AL | 148 | 12 | 68 | High summer humidity requires moisture-mitigating epoxy primer on unsealed slabs. |
| Alaska | AK | 215 | 60 | 112 | Extreme freeze-thaw cycles require air-entrained concrete (6%+) and deep perimeter footings. |
| Arizona | AZ | 162 | 12 | 82 | Intense UV exposure demands UV-stable polyaspartic topcoats to prevent ambering. |
| Arkansas | AR | 145 | 18 | 65 | Moderate winters and humid summers favor early-morning concrete pours and mildew-resistant exterior washes. |
| California | CA | 198 | 12 | 118 | Strict AQMD low-VOC coating regulations (<50 g/L) and AB 12 1-month security deposit caps apply statewide. |
| Colorado | CO | 175 | 36 | 92 | High altitude UV and rapid freeze-thaw swings require 4,000+ PSI concrete and polyaspartic sealers. |
| Connecticut | CT | 185 | 42 | 104 | Road de-icing salts require chemical-resistant urethane or polyaspartic garage topcoats. |
| Delaware | DE | 168 | 30 | 88 | Coastal humidity and high water tables require vapor barrier verification before slab coating. |
| Florida | FL | 165 | 6 | 80 | High hydrostatic vapor pressure in slabs requires 100%-solids moisture-vapor-barrier epoxy primer. |
| Georgia | GA | 158 | 12 | 78 | Red clay soil expansion and heavy organic pollen/algae growth drive high exterior soft-wash frequency. |
| Hawaii | HI | 240 | 0 | 124 | Marine salt air corrosion and freight surcharges significantly increase material landed costs. |
| Idaho | ID | 162 | 36 | 79 | Cold winter ground temperatures require cold-cure polyaspartic formulas for winter installations. |
| Illinois | IL | 178 | 42 | 98 | Strict municipal landlord ordinances (Chicago RLTO) and heavy winter road salt protection required. |
| Indiana | IN | 156 | 36 | 77 | Freeze-thaw concrete spalling protection makes penetrating silane-siloxane sealers high ROI. |
| Iowa | IA | 154 | 48 | 75 | Deep 48-inch frost lines require reinforced perimeter footings and air-entrained mixes. |
Showing first 15 of 50 rows. Download the full .XLS workbook to view all 50 rows.