Trade Estimator Kit • Contractor Estimate & Takeoff Templates

Pro Flooring & Coating Contractor Bid + Takeoff Excel Workbook

Multi-tab Excel & Google Sheets workbook with automated 100%-solids epoxy/polyaspartic gallon formulas, flake coverage calculator, 50-state labor lookup, and printable client proposal.

What's Included in This Multi-Tab Workbook

Compatible with Microsoft Excel (.xls/.xlsx), Google Sheets, Apple Numbers, and includes a formatted Printable PDF Compliance Binder View.

  • Tab 1: Bid & Material Takeoff (9 pre-built rows) Included
  • Tab 2: Pre-Job Slab Checklist (6 pre-built rows) Included
  • Tab 3: 50-State Labor Benchmarks (50 pre-built rows) Included
  • 50-State 2026 Rate & Statutory Lookup Table Included
  • Print-Ready Client / Compliance Binder View Included
Instant Digital Download
$19 One-Time (Zero Monthly Fees)
Includes 3 pre-built tabs + 50-state lookup data

Save 15+ hours of spreadsheet engineering. Every row below is pre-populated so you can plug in your numbers or print the compliance checklist immediately.

← Back to Free Interactive 50-State Calculator

Interactive Workbook Tab Preview & Printable Binder Sheets

Tab 1: Bid & Material Takeoff

Line Item / ParameterInput / QuantityUnitUnit Cost ($)Extended Total ($)Notes / Formula Guide
Project Floor Area480Sq Ft00Enter garage or commercial slab square footage
Moisture-Mitigating Primer (220 sf/gal)2.2Gallons68149.6ASTM F1869 vapor barrier primer
100%-Solids Epoxy Base Coat (160 sf/gal)3Gallons74222High-build pigmented receiver coat
UV-Stable Polyaspartic Topcoat (175 sf/gal)2.8Gallons92257.6Aliphatic UV-resistant clear topcoat
Decorative Vinyl Flake Broadcast (7 sf/lb)69Pounds3.1213.9Full broadcast to refusal (1/4" or 1/8" blend)
Diamond Grinding & Crack Polyurea Filler480Sq Ft0.45216CSP-2/CSP-3 mechanical profile + joint fill
Crew Installation Labor (2 Techs)11Hours85935Grinding, vacuuming, base, scrape, topcoat
Target Contractor Overhead & Profit Margin1Lot980980Target 33%–40% net profit margin
TOTAL TURNKEY CLIENT PROPOSAL PRICE480Sq Ft6.22974.1Final turnkey customer bid ($6.20/sq ft)

Tab 2: Pre-Job Slab Checklist

Inspection StepStandard / RequirementStatus (Pass/Fail)Measured ValueCorrective Action if Needed
1. Concrete Age VerificationMinimum 28 days cure on new slabsPASS90+ DaysDelay coating or use green-concrete primer
2. Moisture Vapor Emission (MVER)< 3 lbs / 1,000 sq ft / 24 hrs (or <75% RH)PASS2.4 lbsUpgrade to 2-coat MVB epoxy primer if >3 lbs
3. Previous Sealer / Water Drop TestWater absorbs within 60 secondsPASS35 secDiamond grind with 16/30 grit metal bond segments
4. Oil & Petroleum ContaminationZero active grease saturationPASSCleanDegrease + torch/poultice oil spots before grinding
5. Spalling & Control Joint InspectionAll cracks chased with V-bladePASS3 hairline cracksFill flush with rapid-cure polyurea + silica sand
6. Ambient & Substrate TemperatureSlab 50°F–85°F, >5°F above dew pointPASS68°F SlabSwitch to cold-cure hardener if below 55°F

Tab 3: 50-State Labor Benchmarks

StateAbbrRegionLabor MultiplierAvg Contractor Rate ($/hr)Climate & Coating Spec Note
AlabamaALSouth0.8668High summer humidity requires moisture-mitigating epoxy primer on unsealed slabs.
AlaskaAKWest1.32112Extreme freeze-thaw cycles require air-entrained concrete (6%+) and deep perimeter footings.
ArizonaAZWest0.9882Intense UV exposure demands UV-stable polyaspartic topcoats to prevent ambering.
ArkansasARSouth0.8465Moderate winters and humid summers favor early-morning concrete pours and mildew-resistant exterior washes.
CaliforniaCAWest1.38118Strict AQMD low-VOC coating regulations (<50 g/L) and AB 12 1-month security deposit caps apply statewide.
ColoradoCOWest1.0892High altitude UV and rapid freeze-thaw swings require 4,000+ PSI concrete and polyaspartic sealers.
ConnecticutCTNortheast1.22104Road de-icing salts require chemical-resistant urethane or polyaspartic garage topcoats.
DelawareDESouth1.0588Coastal humidity and high water tables require vapor barrier verification before slab coating.
FloridaFLSouth0.9680High hydrostatic vapor pressure in slabs requires 100%-solids moisture-vapor-barrier epoxy primer.
GeorgiaGASouth0.9478Red clay soil expansion and heavy organic pollen/algae growth drive high exterior soft-wash frequency.
HawaiiHIWest1.42124Marine salt air corrosion and freight surcharges significantly increase material landed costs.
IdahoIDWest0.9579Cold winter ground temperatures require cold-cure polyaspartic formulas for winter installations.
IllinoisILMidwest1.1598Strict municipal landlord ordinances (Chicago RLTO) and heavy winter road salt protection required.
IndianaINMidwest0.9377Freeze-thaw concrete spalling protection makes penetrating silane-siloxane sealers high ROI.
IowaIAMidwest0.9175Deep 48-inch frost lines require reinforced perimeter footings and air-entrained mixes.

Showing first 15 of 50 rows. Download the full .XLS workbook to view all 50 rows.